Skip to product information
1 of 10

Tektronix

Tektronix DPO 4054 Digital Phosphor Oscilloscope 4-Ch 500MHz 2.5GS/s - Grade D

Tektronix DPO 4054 Digital Phosphor Oscilloscope 4-Ch 500MHz 2.5GS/s - Grade D

Regular price $1,547.55 USD
Regular price Sale price $1,547.55 USD
Sale Sold out
Shipping calculated at checkout.

1 in stock

  • This item is sold AS-IS. No returns or exchanges are accepted.
Condition
For parts or not working
Description

This unit has been tested and functional, however, the Channel 1 BNC connector has a damaged center pin. The channel still functions if the BNC cable is held at a slight angle.

Cosmetically in fair condition showing moderate to heavier scuffs / scratches / blemishes from previous use, as well as there are two visible burn marks—one beneath the Aux In port and another on the handle near the display side. The SD card ejector button is broken off. Pan/Zoom knob covers are missing, and both front foot stilts are also missing.

Includes Digital Phosphor Oscilloscope as pictured. No additional items or accessories are included. Unless pictured, no power adapter / power cable included.

Photos are of the actual unit for sale.

Inventory is on hand and ready to ship. Please feel free to message us with any questions you may have.

Specifics
Manufacturer Tektronix
Model Number DPO4054
SKU 19-31261
Ref 23-113993
View full details